New wood deck
Pressure-treated framing with cedar or treated decking. Hidden fasteners available.
From a simple cedar platform to a two-level composite deck with built-in lighting, we design it with you, handle the permit and build it to last through Gorge wind and winters.
Every quote is itemized: framing, decking, railing, stairs and permit, so you can see where the money goes.
Pressure-treated framing with cedar or treated decking. Hidden fasteners available.
Low-maintenance boards that won't splinter or need staining. Dozens of colors.
Wood, aluminum, cable or composite railings, built to code height and spacing.
Wide, comfortable steps with proper rise and run. Lighting can be built in.
Rotten boards, wobbly railings, loose stairs and failing ledger boards fixed before they get worse.
Wash, sand where needed and apply a penetrating stain that suits our sun and rain.
Example pricing for this sample site. Final pricing depends on size, height, materials and site access.
Both make a great deck. Wood costs less up front and looks beautiful; composite costs more but skips the yearly staining. We'll bring samples to your design visit so you can see them in your own light.
Whatever goes on top, the framing underneath is pressure-treated lumber, built to code and flashed properly where it meets your house.
Talk through options with usWe measure, talk through how you'll use it and bring material samples.
A 3D sketch and an itemized quote, usually within a week.
We pull the permit, then build. Most decks take 1–3 weeks.
Inspection passed, site cleaned, care tips handed over.
Photos on this sample are royalty-free stock images. A real site shows the owner's own job photos.






I've been framing and finishing for twenty years, the last twelve building decks and porches around the Gorge. Ridgeback is me, my nephew Eli and a two-person crew.
We build like we're going to be sitting on it: proper footings, flashing where the deck meets the house, and hardware that won't rust out in five years.
Weekends you'll find me on the river or fixing something at my own place that I've been putting off.
Based in Hood River, we build on both sides of the river, from Cascade Locks to The Dalles and up the valley to Parkdale.
If budget matters most and you don't mind staining every few years, wood is great. If you'd rather never stain again, composite is worth the extra cost. We'll show you both.
Yes. Most decks over 30 inches high or attached to the house need a permit. We handle the drawings, application and inspections.
Design and permit usually take 2–4 weeks. The build itself is typically 1–3 weeks depending on size and weather.
Often, yes. If the framing is sound, we can replace boards, railings or stairs. If the posts or ledger are rotting, we'll show you and explain the options.
Every new build starts with a simple 3D drawing so you can see layout, stairs and railings before we cut a board.
Late winter and early spring fill up fast for summer builds. Fall is a great time for repairs and refinishing.
Tell us a bit about the project and we'll call to set up a design visit, usually within a few days.
(541) 555-0161